Improved clarity and technical accuracy — GIS-driven vegetation risk reports for highway verges, rights of way and associated infrastructure.
UA-5 provides specialist vegetation surveying and clearance support to the UK highways network. Working in two-person survey teams, our surveyors produce GIS-driven reports detailing the works required to maintain road safety, visibility and operational integrity.
Our assessments enable contractors to present full, accurately quantified vegetation scopes — reducing programme delays and improving the quality of downstream planning.
Survey boundaries, location lists and route data confirmed. All required inductions and traffic management briefings completed. Surveyors briefed on highway safety requirements, survey standards and any site-specific hazards before deployment.
Two-person teams conduct vegetation risk assessments at each assigned highway location. Species, condition, risk rating and recommended maintenance actions recorded. All relevant details captured using GPS-enabled tablets. Traffic management requirements complied with at every location.
Automated validation checks applied for data completeness and spatial consistency. Manual inspection of high-risk or anomalous locations before data release. All outputs reviewed against client specification prior to submission.
Survey data delivered in agreed digital formats. Weekly progress reports provided by route and surveyor output. Transparent audit trail maintained for all collected data. Final QA-cleared dataset delivered on area completion.